目录简介 | Contents
Foreword 5 1 Scope 9 2 Normative References 9 3 General Provisions 10 3.1 Routes 10 3.2 Operation speed 16 3.3 Minimum interval time of the carrier 17 3.4 Available area of the compartment and allowable seating capacity 18 3.5 The safety that the steel wire rope is installed on the support’s saddle, the holding (pressing) cable pulley 19 3.6 Action forces calculated on the lines and steel wire ropes 20 3.7 Rescue 24 3.8 Quality guarantee 25 4 Steel Wire Rope 26 4.1 Selection principle of the steel wire rope 26 4.2 Determination of the steel wire rope’s parameters 26 4.3 Fixation at end of the steel wire rope 29 4.4 Inspection of the steel wire rope 30 4.5 Scrapping of the steel wire rope 31 5 Mechanical Equipment in the Station 33 5.1 Driving unit 33 5.2 Rope wheel 38 5.3 Driving shaft, rotation axle and spindle 38 5.4 Tensioning unit 39 5.5 Release unit, locking unit 40 5.6 Accelerating unit and decelerating units 41 5.7 Stopper used for controller spacing between the cars 41 5.8 Units on the cars for opening and closing the door 42 5.9 Position indicator 42 5.10 Guiding unit of the cars 42 5.11 The buffer 42 5.12 Ropeway supporting unit 43 6 Station House 43 6.1 General Regulations 43 6.2 Platform 44 7 Line Facilities 45 7.1 Holder and Foundation 45 7.2 Equipment on Holder 46 8 Carrying Tools 49 8.1 General Regulations 49 8.2 Calculation 49 8.3 Fixed Rope Grip and Detachable Grip 50 8.4 Running Car 51 8.5 Passenger Car Brake 52 8.6 Lifting Box 53 8.7 Carriage of Reciprocating Cableway 53 8.8 Carriage Door 54 8.9 Lifting Frame 54 8.10 Hanging Seat 55 8.11 Rescue Car 55 9 Electrical Equipment 55 9.1 General Regulations 55 9.2 Electrical Dragging Device 57 9.3 Control 57 9.4 Safety Circuit 58 9.5 Signal Device 59 9.6 Test 60 9.7 Communication 60 9.8 Lightning and Grounding 60 10 Installation 61 10.1 General Regulations 61 10.2 Installation of Steel Structure and Lien Equipment 63 10.3 Installation of Steel Wire Rope 65 10.4 Installation of station equipment 67 11. Trial run 73 11.1 General regulation 73 11.2 Zero load trail run 73 11.3 Load trial run 74 11.4 Trial run of emergency drive (or rescue drive and auxiliary drive) 74 12. Operation 74 12.1 Personnel and task 74 12.2 Running 77 12.3 Maintenance 77 13. Mark 80 13.1 Traffic mark 80 13.2 Road traffic marking 80 13.3 Aviation obstruction mark 83 13.4 Special prompts for hanging-seat ropeway 83 |