目录简介 | Chapter 1 General Chapter 2 Preparation for Construction Chapter 3 Earthworks Section 1 General Rules Section 2 Draining and Lowering Underground Water level (I) Draining (II) Lowering Under Ground Water level Section 3 Excavation Section 4 Back Filling Section 5 Foundation Pits (Channels ) and Piping Ditches Section 6 Construction in Rain Season Section 7 Construction in Winter Section 8 Reinforcement of Banks Chapter 4 Explosion Works Chapter 5 Works Inspection and Acceptance Appendix 1 Classification of Soil Appendix 2 Field Verification of Soil Appendix 3 Reference Table for Soil Names Appendix 4 Allowable Flow of Water in Temporary Draining Ditch Appendix 5 Compaction Test Appendix 6 Formula for Calculation of Maximum Dry Unit Weight of Clayed soil or Sand Soil of Bad Draining Appendix 7 Technical Performance Several Main Detonating Agents Appendix 8 Compositions, Performances and Explosion Parameters of Common Explosives |