目录简介 | Contents 1 General Principles 2 Terms and Symbols 2.1 Terms 2.2 Symbol 3 Preparations for Construction 3.1 Technical preparation 3.2 Technical data 3.3 Unpacking inspection and management 3.4 Construction site possessed condition 3.5 Foundation acceptance and treatment 4 Machine Installation 4.1 Installation with sizing block 4.2 No-sizing block installation 4.3 Anchor bolt 4.4 Lifing in place, levelling and alignment 4.5 Grouting 5 Cleaning and Assembly 5.1 General regulations 5.2 The bolt, key and guide pin assembly 5.3 Rolling bearing assembly 5.4 Sliding bearing assembly 5.5 Stationary fit piece assembly 5.6 Sealing member assembly 5.7 Transmission belt, chain and gear assembly 6 Auxiliary Facility and Pipeline Installation 6.1 Auxiliary facility installation 6.2 The pipe installation of oil system and miscelleous systems 6.3 Pipeline and machine connection 7 Pre-test Run 7.1 The division of labor and responsibility for pre-test run 7.2 Condition and preparation for pre-test run 7.3 System test and public works test run working 7.4 Solo test run 8 Documents for Project Completion Appendix A Mud-jack method or base mortar method placing sizing block Appendix B No-sizing block installation Appendix C Anchor bolt screwing down moment and axial tension reference value Appendix D Coupling alignment and leveling operation procedure Appendix E Proportioning of concrete for grouting Appendix F Dispensation and selection for cleaning solution Appendix G Common derusting method and quality requirements Appendix H Common anti-seizing agent Appendix J Calculation method for bolt rigidity, connected piece rigidity and fastening moment Appendix K Assembly method for stationary fit and transition fit Appendix L Vee belt tensile force adjustment Appendix M The mixing proportion of the pipeline pickling liquor Appendix N The wording explanation of the national standard |