咨询热线:400-678-1309 中文版  English


标准翻译 - 查看详情
标准编号  
SH/T 3023-2005
标准名称  
SH/T 3023-2005 石油化工厂内道路设计规范 (英文版)
英文名称  
Design specification for road in petrochemical engineering
发布日期  
2006-01-17
实施日期  
2006-07-01
全文页数  
19
原版价格  
22.00元
是否译文  
译文报价  
400.00元
译文格式  
Word/PDF
目录简介  
3.1 Primary roadPREFIX = O
Primary road indicates the road connecting the major entrances of the plant, or busy transportation road in the plant.
3.2 Secondary road
Secondary road indicates the road connecting the subordinate entrance of the plant, fire protection road or the road with fewer vehicles or pedestrian.
3.3 Service roads
Service road indicates the road designed in the process or system unit for the purpose of inspection and repair or fire-protection.
3.4 3.4 Accessways
Accessways indicates the road connecting the primary or secondary road in the workshop, warehouse or block.
3.5 Sidewalk
Sidewalk indicates the road set beside the two sides of primary and secondary road, for the purpose of pedestrian road.
3.6 Concrete pavement
Concrete pavement is paved with cement concrete surface layer and sub-base (or mat base).
3.7 Asphalt concrete pavement
Asphalt concrete pavement is formed through mixing proper amount and different class of mineral aggregates and asphalts under normal temperature into composite material, then spreading and compacting the composite material into surface layer and sub-base (mat base) to pave.
3.8 Asphalt pour into pavement
Asphalt pour into pavement is formed through pouring asphalt onto the initially smashed stone (gravel),then spread the joint filler on different layers, compact the pouring asphalt into the surface layer and sub-base (mat base) with thickness of PREFIX = ST1 4cm - 8cm to pave
关键字  
SH/T 3023 英文版 English Version
  在线下单  
您的电话:
您的邮箱:
  联系我们
Copyright © 2009-2011 北京文心雕语翻译有限公司 保留所有权利。京ICP备09087426号
公司关键字:北京翻译公司 | 北京英语翻译公司 | 北京日语翻译公司 | 北京德语翻译公司