Contents 1 Scope 2 Normative references 3 General requirements 4 Preparation of construction 5 Materials 6 Construction process 7 Precasting processing 7.1 General requirements 7.2 Soleplate precasting 7.3 Wallboard precasting 7.4 Vault precasting 7.5 Precasting of inner suspending roof 7.6 Precasting of other elements 7.7 Delivery inspection 8 Recheck of the foundation and outer reinforced concrete tank 8.1 Recheck of foundation 8.2 Recheck of outer reinforced concrete tank 9 Assembly of tank bottom 9.1 General requirements 9.2 Assembly of overlapped tank soleplates 9.3 Assembly of butt joint soleplate in tank 9.4 Assembly of inner double-layer low-temperature storage tank bottom 10 Assembly of tank shell 10.1 General requirements 10.2 Assembly of tank shell 11 Assembly of tank deck 11.1 Central support method 11.2 Air-lifting method 12 Installation of appurtenance 12.1 Installation of pipe at open pore of tank shell 12.2 Installation of other appurtenances 13 Welding 13.1 General requirements 13.2 Management of welding materials 13.3 Welding requirements 13.4 Welding sequences and methods 13.5 Repairing 14 Cold insulation 14.1 General requirements 14.2 Cold insulation of tank bottom 14.3 Cold insulation of tank shell 14.4 Cold insulation of pipelines in tank 14.5 Cold insulation of inner suspending roof 15 Inspection and test 15.1 Inspection of weld appearance 15.2 Nondestructive test and leakage test of weld 15.3 Geometric shape and dimension inspection of tank shell 15.4 Test of tank body 16 Engineering acceptance Appendix A (Informative) Several Typical Structures of Low-temperature Storage Tank Appendix B (Informative) Construction Process Flow |