咨询热线:400-678-1309 中文版  English


标准翻译 - 查看详情
标准编号  
SY/T 6426-2005
标准名称  
SY/T 6426-2005 钻井井控技术规程 (英文版)
英文名称  
Specification for well control technology of drilling
发布日期  
2005-03-19
实施日期  
2005-05-01
全文页数  
74
原版价格  
28.00元
是否译文  
译文报价  
1,850.00元
译文格式  
Word/PDF
目录简介  
1 Scope
This standard specifies the principles for management, implementation and training of well control technology of drilling.
This standard is applicable to the pressure control technology of oil and gas wells in exploration and production drilling operations on land
2 Normative
The following normative documents contain provisions which, through reference in this standard, constitute provisions of this standard. For dated references, subsequent amendments to, or revisions of, any of these publications (exclude errata) do not apply. However, parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references, the latest edition of the normative document referred to applies.
SY/T5087 Safe drilling recommendations for sour oil and gas wells
SY/T5127 Specification for wellhead equipment and christmas tree
SY5225 Safety rule for fire and explosion prevention during drilling, exploration, storage and transportation of oil and gas
SY/T5430 Determination of formation fracture pressure, leak-off test method for casing shoe
SY5742 Examination regulation for well control safety technology in oil and gas drilling
SY/T5858 Safety code for industrial use of fire in petroleum enterprises
SY5876 Safety inspection regulation for petroleum drilling crew
SY/T5964 Matching, installation adjustment and maintenance for drilling well control equipment
SY/T6203 Wrecking method for oil and gas well blowout and fires
3 Well control design
3.1 The distances between the wellhead and high voltage lines and other permanent facilities shall not be less than 75m, between the wellhead and any dwelling shall not be less than 100m, between the wellhead and railway and highway shall not be less than 200m, between the wellhead and highly dangerous places with high population density such as large scale fuel depots, hospitals and schools shall not be less than 500m.
For oil and gas wells with H,S, the measures for emergency evacuation shall refer to the pertinent regulations in the SY/T 5087.
3.2 Survey and investigation shall be conducted on dwellings, schools, plants and mines (including the mineral units for underground minerals production),national defense facilities,high voltage power lines, water resources and wind direction variation in a certain range of the wellsite and their results shall be marked and noted in the geologic design.
Conditions of the layout, trend, length and depth of mining shafts and trenches such as coalmines shall be marked specifically.
关键字  
SY/T 6426 English Code
  在线下单  
您的电话:
您的邮箱:
  联系我们
Copyright © 2009-2011 北京文心雕语翻译有限公司 保留所有权利。京ICP备09087426号
公司关键字:北京翻译公司 | 北京英语翻译公司 | 北京日语翻译公司 | 北京德语翻译公司