咨询热线:400-678-1309 中文版  English


标准翻译 - 查看详情
标准编号  
SY/T 5954-2004
标准名称  
SY/T 5954-2004 开钻前验收项目及要求 (英文版)
英文名称  
Inspection items and requirements prior to spudding
发布日期  
2004-07-03
实施日期  
2004-11-01
全文页数  
17
原版价格  
12.00元
是否译文  
译文报价  
550.00元
译文格式  
Word/PDF
目录简介  
Inspection items and requirements prior to spudding
———————————————————————————————————
1 Scope
This standard specifies the inspection items and requirements for oil and gas drilling, logistics, safety and environment protection prior to spudding. focusing, on well-site layout, equipment foundation, and equipment installation; drilling operation preparation,
This standard is applicable to initial spud of onshore oil and gas well drilling operation.
2 Nonnative references
The following normative documents contain provisions which, through reference in this standard, constitute provision of this standard. For dated references, subsequent amendments to, or reversions of. any of these publications (exclude errata) do not apply. However, parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent edition of the normative documents indicated below. For undated references. the latest edition of the normative document referred to applies.
GB 8978 Criterion of Sewage Disposal
SY 5225-1994 Safety Regulations for Fire and Explosion Preventions During Drilling, Production. Storage and Transportation of Oil and Gas.
SY/T 5466 Well site preparation and layout requirements.
SY IT 5957 Technical Requirements for well-site Electric System Installation.
SY IT 6426 Specification for Well Control Technology of Drilling.
3 Well-site preparation
3.1 Well-site
Well-site size and layout shall be as specified in SY/T 5466.
3.2 Equipment foundation
The selection, specification and layout for equipment foundation shall be in accordance with the design.
关键字  
SY/T 5954 English Code
  在线下单  
您的电话:
您的邮箱:
  联系我们
Copyright © 2009-2011 北京文心雕语翻译有限公司 保留所有权利。京ICP备09087426号
公司关键字:北京翻译公司 | 北京英语翻译公司 | 北京日语翻译公司 | 北京德语翻译公司