咨询热线:400-678-1309 中文版  English


标准翻译 - 查看详情
标准编号  
SY/T 5412-2005
标准名称  
SY/T 5412-2005 下套管作业规程 (英文版)
英文名称  
Operation code for casing running
发布日期  
2005-07-26
实施日期  
2005-10-01
全文页数  
40
原版价格  
16.00元
是否译文  
译文报价  
1,100.00元
译文格式  
Word/PDF
目录简介  
Contents
Foreword
1 Scope
2 Normative references
3 Preparation before operation
4 Casing running operation
Annex A (Normative) Table of make - up torque for standard round thread casing
Annex B (Normative) Table of make - up torque for buttress thread casing
———————————————————————————————————
1 Scope
This standard specifies the technical requirements for casing running operations in vertical well, directional well, horizontal well and extended-reach well.
This standard is applicable to casing running operations in oil and gas well.
2 Normative references
The following normative documents contain provisions which, through reference in this standard* constitute provisions of this standard.
For dated references, subsequent amendments to, or revisions of, any of these publications (exclude errata) do not apply. However, parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below.
For undated references, the latest edition of the normative document referred to applies.
SY/T 5199 Thread compounds for casing, tubing and line pipe (neq API RP 5A3)
SY/T 5322 Design method of casing string strength
SY/T 5334 Calculation method of casing centralizer installation interval
SY/T 5396 Well-site transportation and inspection criterion for oil casing
3 Preparation before operation
3.1 Data preparation
Before running in casing, the following data shall be collected: casing program, actual depth, bottom hole assembly, kick-off point, hole inclination and azimuth, horizontal displacement ,bottom hole temperature, hole diameter from caliper logging, mud properties, formation fluid properties, geologic zonation and lithology in the open hole,and well conditions, etc.
3.2 Wellbore preparation
3.2.1 The well depth meets the requirement of drilling design.
3.2.2 Wellbore quality conforms to the design requirement.
3.2.3 Before running in the casing, a wiper trip is required with the original drill stem, and the following requirements shall be satisfied.
关键字  
SY/T 5412 English Code
  在线下单  
您的电话:
您的邮箱:
  联系我们
Copyright © 2009-2011 北京文心雕语翻译有限公司 保留所有权利。京ICP备09087426号
公司关键字:北京翻译公司 | 北京英语翻译公司 | 北京日语翻译公司 | 北京德语翻译公司