Preview |
Contents
1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Basic Requirements 4 Materials, Mix Proportion, Preparation and Transportation of Mass Concrete 4.1 General Requirements 4.2 Materials 4.3 Mix Proportion Design 4.4 Preparation and Transportation 5 Concrete Construction 5.1 General Requirements 5.2 Construction Technology Preparation 5.3 Formwork Engineering 5.4 Concrete Pouring 5.5 Concrete Curing 5.6 Construction under Special Climate Conditions 6 Site Monitoring and Test for Temperature Control Construction Appendix A Calculation Method for Output of Concrete Pump and Quantity of Required Mixer Trucks Appendix B Calculation Method for Thermal Stress and Shrinkage Stress of Poured Body with Mass Concrete in Construction Stage Appendix C Calculation Method for Surface Insulation Layer of Poured Body with Mass Concrete Explanation of Wording in This Code
|