Preview |
1 General Specification 2 Definitions 3 Construction Preparation and Construction survey 3.1 Construction Preparation 3.2 Construction Survey 4 Trench Foundation 4.1 Foundation Pit 4.2 Cofferdam 4.3 Excavation and Drainage 4.4 Foundation Treatment 4.5 Foundation Check 5 Penetrated Pile Foundation 5.1 General Specification 5.2 Pile Test and Bearing Capacity of Foundation Pile 5.3 Fabrication Requirement of Piles 5.4 Pile-sinking 5.5 Quality Standard of Pile-sinking 6 Cast-in-place Concrete Pile Foundation 6.1 General Specification 6.2 Drilling of Cast-in-place concrete pile 6.3 Drilling 6.4 Clearing of the drilling hole 6.5 Underwater concreting 6.6 Excavation of Cast-in-place Concrete Pile 6.7 Pile Cap 6.8 Quality Inspection and Quality Standard 7 Open Caisson Foundation 7.1 General specification 7.2 Fabrication of Open Caisson 7.3 Floating Delivery and Putting in Place of Open Caisson 7.4 Earth Removal and Sinking of Open Caisson 7.5 Inspection of Foundation Bottom 7.6 Bottom Sealing of Open Caisson 7.7 Filling of Open Caisson Hole and Concrete Pouring of Top Slab 7.8 Quality Inspection and Quality Standard 8 Underground continuous walls 8.1 General Specification 8.2 Guide Walls 8.3 Construction of underground continuous walls 8.4 Quality Standards 9 Forms, Support and Centering 9.1 General Specification 9.2 Design of Forms, Support and Centering 9.3 Fabrications and Erection of Forms 9.4 Fabrication and Erection of Support and Centering 9.5 Removal of Forms, Support and Centering 9.6 Quality Inspection 10 Steel Reinforcing Bar 10.1 General Specification 10.2 Process of Steel Bar 10.3 Connection of Steel Bars 10.4 The Fabrication and Erection of Reinforcement Skeleton and Steel Mesh 10.5 Quality Inspection and Quality Criteria 11 Concrete and Reinforced Concrete Engineering 11.1 General Specification 11.2 Materials Used for Mixing Concrete 11.3 Mixture ratio of Concrete 11.4 Mix of Concrete 11.5 Transportation of concrete 11.6 Concreting 11.7 Anti-freeze, anti-seep and anti-erosion of concrete 11.8 Concrete curing and finishing 11.9 High strength concrete 11.10 Concrete construction under hot weather or raining days 11.11 Quality inspection and criteria 12 Pre-stressed Concrete Project 12.1 General Specification 12.2 Pre-stressed reinforcement 12.3 Anchor, Clamp, and Connector 12.4 Pipe 12.5 Protection of Pre-stressed Materials 12.6 Fabrication of Pres-stressed Reinforcement Bar 12.7 Concreting 12.8 Pre-stress Implementation 12.9 Pre-tensioning Method 12.10 Post-tensioning Method 12.11 Post-tensioning opening grouting 12.12 Quality Inspection and Quality Standards 13 Masonry 13.1 General specification 13.2 Materials 13.3 Mortar stone masonry and precast concrete block pier and abutment and retaining wall 13.4 Mortar stone block and precast concrete block arch ring 13.5 Bridge and pier and appurtenance works 13.6 Build body pointing and curing 13.7 Quality inspection and standard 14 Constructing in winter 14.1 General specification 14.2 Concrete, reinforced concrete and precast concrete block in winter construction 14.3 Construction of Masonry in winter 14.4 Quality control 15 The reinforced concrete and pre-stressed concrete girder bridge 15.1 General specification 15.2 The casting of the girder bridge on platform support 15.3 Cantilever casting-in-place 15.4 Erection by protrusion 15.5 Jack-in installation 15.6 The construction of assembling bridge 15.7 Construction observation and controlling 15.8 Quality inspection and standard 16 Arch Bridge 16.1 General Specification 16.2 Cast-in-site concrete arch ring 16.3 Assembly concrete and reinforced concrete arch ring 16.4 Swing erection 16.5 Steel-piped concrete arch 16.6 Assembly trussed arch and rigid-framed arch 16.7 The arch superstructure 16.8 Erection observation and control 16.9 Quality inspection and quality standard 17 Steel Bridges 17.1 General Specification 17.2 Fabrication of Steel Bridge 17.3 Acceptance Inspection 17.4 Assembling Steel Bridge on Construction Site 18 Cable Suspension Bridge 18.1 General specification 18.2 Anchor 18.3 Cable Tower 18.4 Catwalk for Main Cable 18.5 Main Cable Construction 18.6 Cable Saddle 18.7 Cable clamp and suspension cable 18.8 Stiffened girder 18.9 Pavement of the steel bridge deck 18.10 Others 19 Cable-stayed Bridge 19.1 General Specification 19.2 Cable tower 19.3 Main Beam 19.4 Staying Wire 19.5 Quality Standard 20 Bridge Deck and Appurtenant Works 20.1 General Specification 20.2 Bearings 20.3 Extension Device 20.4 Settlement Joint 20.5 Waterproof Bridge Deck 20.6 Drainpipe 20.7 Paving the Bridge Deck 20.8 Bridge Deck Protection Facilities 20.9 Joining Slabs at the End of a Bridge 21 Culvert 21.1 General provision 21.2 Pipe Culvert 21.3 Arch Culvert and Cover Slab Culvert 21.4 Reverse siphon Pipe 21.5 Quality Standard 22 Passage Bridge and Culvert 22.1 Butting Construction of Bridge and Culvert 22.2 Water Proof and Drainage of Pass-way Bridge and Culvert 22.3 Quality Inspection and Quality Standard Appendix A Distance Measurement Correction and Length Appendix B Test pile testing method Appendix C-1 Performance Requirement and Required Quantity Calculation Method of Slurry Material and Additives Appendix C-2 Measurement of Various Slurry Performance Index Appendix D Calculating the Loading of Common Moulding Plate Appendix E-1 Mechanical and Process Performances of Reinforcement Appendix E-2 Quality inspection content and standard of welded reinforcement Appendix E-3 Design Principle and Performance Class of the Mechanical Connected Joints of the Reinforcement Appendix F-1 Strength Class and Tensile Strength of Common Cement Appendix F-2 On-site retrial inspection items of structure concrete additives Appendix F-3 Technical specification for mixed material Appendix F-4 Concrete confection strength calculation Appendix F-5 Time needed for concrete to reach 0.5MPa and 1.2MPa in strength Appendix G-1 Mechanical performance and surface quality requirement of steel wire used for prestressed concrete Appendix G-2 Mechanical performance and surface quality requirement for steel strand used for prestressed concrete Appendix G-3 Mechanical performance and surface quality requirement for heat treatment reinforcement-used for prestressed concrete Appendix G-4 Mechanical performance for cold drawn reinforcement used for prestressed concrete Appendix G-5 Mechanical performance and surface quality requirement for cold drawn low carbon steel wires used for prestressed concrete Appendix G-6 Mechanical performance and surface quality requirement for finish rolling screw thread reinforcement used for prestressed concrete Appendix G-7 Sampling quantity, inspection content and quality requirement for metal screw pipe used for prestressed concrete Appendix G-8 Calculation of average tensility and tension of prestressed reinforcement Appendix G-9 Measurement of Prestress Loss Appendix G-10 Test of grout discharging rate and Expansion rate Appendix G-11 Grout thickness test Appendix H Technical index for quicklime and slaked lime Appendix J Thermal calculation of construction in winter Appendix K-1 Supersonic wave penetration detection Appendix K-2 Test method of slide resistant coefficient for high strength screw connection Clarification upon Terms |