Preview |
1.General 2.Inspection of Raw Material and Equipment 3.Foundation Pit for Pole and Burying of Foundation 4.Assembling, Erecting of Pole and fnstalling of Insulator. 5.Installation of Guy Wire 6.Erecting of Conductor 7.Electric Apparatus on 10kV and below Overhead Power Line 8.Service Line 9.Engineering of Earthing 10. Hand-over Acceptance for the Works Appendix f Description of Terms Used in This Code Additional Description |