1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Symbls 3 Horizontal control measurement 3.1 General Provisions 3.2 Satellite positioning 3.3 Traverse survey 3.4 Triangular network survey 4 Vertical control surveys 4.1 General Provisions 4.2 Leveling survey 4.3 EDM-trigonometric leveling 4.4 GPS fitting height measurement 5 Topographic surveys 5.1 General Provisions 5.2 Mapping control survey 5.3 Plotting method and technical requirements 5.4 Digitalization of paper topographic map 5.5 Digital Elevation model(DEM) 5.6 Topographic plotting of general area 5.7 Topographic plotting of building area of the town 5.8 Survey of the current map of industrial and mining area 5.9 Topographic survey of water area 5.10 Editing and illustration of the maintenance of topographic maps 6 Line surving 6.1 General Provisions 6.2 Survey for the railway and road 6.3 Measurement of overhead cableway 6.4 Survey of gravity flow and pressure piping 6.5 Measurement of overhead power transmission sequence 7 Underground Pipeline Measurements 7.1 General Proviond 7.2 Underground Pipeline Survey 7.3 Underground Pipeline Measurement 7.4 Underground Pipeline Mapping 7.5 Underground Pipeline Information Network 8 Construction Survey 8.1 General Provisions 8.2 Field Zone Control Survey 8.3 Industrial and Civil Building Construction Survey 8.4 Hydraulic Structure Construction Survey 8.5 Bridge Construction Surveying 8.6 Tunnel Construction Surveying 9 Completion General Plan Drawing and Actual Survey 9.1 General Provisions 9.2 Completion General Plan Drawing 9.3 Completion General Plan Actual Surveying 10 Deformation Monitoring Survey 10.1 General Provisions 10.2 Horizontal Displacement Monitoring Survey Reference Net 10.3 Vertical Displacement Monitoring Survey Reference Net 10.4 Basic Monitoring Method and Technical Requirements 10.5 Industial and Civil Building Deformation Monitoring Survey 10.6 Hydraulic Structure Deformation Monitoring Survey 10.7 Underground Engineering Deformation Monitoring Survey 10.8 Bridge Deformation Monitoring 10.9 Landslide monitoring 10.10 Data processing and deformation analysis Appendix A Evaluation method for mean square error of project with higher accuracy
requirement Appendix B Specification for mark for horizontal control point and burying monument mark. |