Preview |
Contents 1 General provisions 2 Terms 3 Basic requirements 4 Installation of overhead line and electric equipment on pole 5 Installation of transformer and box-type substation 6 Installation of complete set of distribution cabinet ,control cabinet (screen, console) and power and
linghting distribution box (panel) 7 Inspection and wiring of LV motor ,electric actuator 8 Installation of diesel generator set 9 Installation of uninterrupted electrical source 10 Testing and test run of LV electrical power equipment 11 Installation of bare generatrix close generatrix and insert generatrix 12 Cable tray installation and cable laying inside cable tray 13 Cable laying in cable trench and cable silo 14 Laying of wire conduit cable conduit and wiring slot 15 Wire cable through conduit and wiring in slot 16 Wire distribution in slot 17 Tightwires and auxiliary 18 Manufacture of cable head wiring and insulation test 19 ordinary lamp fitting 20 Installation of special purpose lamps 21 Installation of landscape lighting lamps of buildings ,indentification lights for aviation barrage and
garden lamps 22 Installation of switch socket and fan 23 The on power commissioning of the lights in the building 24 Installation of the grounding devices 25 Laying of the lightning protective down lead and the grounding main line in the transformation and
distribution room 26 Installation of the air terminal 27 The equal potential coupling of the building 28 The acceptance check of divisional (sub-divisional) project Appendix A The commissioning test of the generator Appendix B The commissioning test of low voltage electrical equipment Appendix C The join dimension of the bus line bolts Appendix D The tighten moment of the lappet bolt of the bus line Appendix E The minimum safety clear distance of the indoor bare bus line Explanation of wording in this code
|