中文版  English
 
Standard Store detail
Document Title  
JTG E41-2005 Test Methods of Rock for Highway Engineering (Text of Document is in English)
Implementation Date  
01/08/2005
Number of Pages  
44P
Price  
$200.00 USD
Preview  
3 Sample preparations
3.1 Samples with natural water content shall be taken on site and blasting or wet drill
method is strictly forbidden. Water content change in the process of sample taking,
transportation, storage and preparation shall not exceed 1%.
3.2 The dimension of specimens shall be larger than the largest particle of the rock by 10
times and the mass of each specimen shall not less than 40g and not larger than 200g.Sample
numbers of each set should be greater than or equal to 5.
3.3 Rock name, color, mineralogical composition, structure, construction, degree of
weathering, agglutinate property and measures taken to maintain water containing of samples.
4 Test Procedures
4.1 Put the finished samples into the weighing box, which has been dried to the constant
difference and weigh the mass of samples and weighing box before drying (m1). Weighing in
this test is accurate to 0.01g.
4.2 Put the weighing box together with the sample into the dryer. rock free of crystal water
shall be dried to the constant quantity at constant temperature 105℃~110℃ for 12h~ 24 h.
rock with crystal water shall be dried to the constant quantity at constant temperature
60℃±5℃ for 24h~48h.
  shopping shopping contact by skype
 

Copyright © Lancarver, 2009-2010 All Rights Reserved.